







Nest wheelie bins shed / store in Grey Rattan Weave (WBS-3G)
- This wheelie bin shed / store is ideal for hiding your bin from view in the garden.
- Durable material: Poly rattan is an exceptional resistance material and durable in different weather conditions.
- Stable frame: The powder-coated steel frame ensures sturdiness and stability.
- Practical design: The lid of this bin shed can be opened for easy access to the wheelie bin when depositing.
- Front doors with lock for easy removal and emptying of bins
- The lid of the storage box has a plastic board underneath to keep stored items dry and protected from moisture and weather elements
- Quick Delivery
- Assembel required
With over two decades of experience, we’ve dedicated our time to not only sourcing the best materials but extensively developing our stylish models.
Care for your Furniture.
The Rattan Furniture is hand woven, so no two pieces are identically the same, so one section can vary from the other which has no impact on its durability.
Glass tops - A Magnifying glass effect caused by Glass, objects ( Bottles, drinking Glasses, spectacles etc) can have an effect on the rattan due to the heat from magnification which leads to the rattan melting and going over its temperature range and will go brittle and snap . We recommend shading from direct sun light. ( Parasol- Gazebo etc)
The Rattan may sag under the glass in hot condition direct sunlight which reforms back to normal when it's cooled back down.
The Staple fixing, screws and bolts & welds can develop a film of rust in damp conditions.
The frames of our sets are coated for optical reasons. The coating is sometimes minimally damaged in the production process. This doesn't affect the quality or durability of the frame in any way.

This product has no reviews yet.








